Sprint 15 Engineering Log
Program Context
- Phase: Phase 5
- Sprint: Sprint 15
- Status: Planned
- Primary Architecture Layers: Detection Engine, Reporting / Compliance
Architectural Intent
Validate directory scan coverage and telemetry integration quality for Gobuster workflows.
Implementation Detail
QA plan includes coverage assertions, parser integrity checks, and orchestrator telemetry contract validation.
Security and Control Posture
- AAA scope and authorization boundaries are enforced according to current orchestrator policy.
- Telemetry and audit events are expected to remain structured, attributable, and export-ready.
- Integration interfaces are maintained as loosely coupled contracts to preserve VectorVue interoperability.
QA and Validation Evidence
Planned scenario matrix for scan-depth variants and expected finding sets.
Risk Register
Risk is unstable discovery baselines across environments; mitigation through controlled targets and deterministic fixtures.
Forward Linkage
Sprint 16 proceeds with Impacket wrapper development.