Sprint 5 Engineering Log
Program Context
- Phase: Phase 3
- Sprint: Sprint 5
- Status: Completed
- Primary Architecture Layers: VectorVue Integration Layer, Reporting / Compliance
Architectural Intent
Validate API endpoint behavior, transport security, and telemetry delivery guarantees for the VectorVue integration channel.
Implementation Detail
QA smoke paths and optional live-mode checks were integrated to evaluate encryption posture, endpoint response handling, and telemetry dispatch correctness.
Security and Control Posture
- AAA scope and authorization boundaries are enforced according to current orchestrator policy.
- Telemetry and audit events are expected to remain structured, attributable, and export-ready.
- Integration interfaces are maintained as loosely coupled contracts to preserve VectorVue interoperability.
QA and Validation Evidence
Sprint QA outcomes confirmed baseline integration viability and secured transport assumptions under test harness control.
Risk Register
Primary risk was test-environment mismatch for live endpoint checks; mitigated through controlled QA flags and deterministic smoke contracts.
Forward Linkage
Sprint 6 transitioned integration work toward tool wrapper implementation (Nmap).